Basic information on the project:
Time: 2020-2021
Location: China
Type: Plaza,Office Building, and High-rise residential building.
Project name:Steel door projects case of Nanning Sunshine City- Tanxi of Datang impression Project (Phase I)
Project Address: 51 Youai West Road, Xi Xiangtang District, Nanning, Guangxi, China
Project introduction:
Datang Impression is a 206-acre fully supporting city in Xi Xiangtang District jointly manufactured by Sunshine City Group, Tianyu Real Estate and Datang Real Estate, three listed brand real estate enterprises.Sunshine City Group, is one of the top 500 national real estate enterprises under Sunshine City Holdings, with a layout of 30 major regions in the country, developing hot markets such as Regency Bay, Mid-Levels Bay and Datang Impression in Nanning, and again winning the single sales area of Nanning in the first quarter of 2018;Skyfame City, developed by Guangzhou Skyfame Real Estate, has ranked in the top three single-disc sales in Nanning for two consecutive years and has won the five elephants for consecutive years, and is building a new landmark ASEAN Tower of nearly 500 meters for Nanning, and introducing an international super five-star Westin hotel;Datang Real Estate has entered Nanning for ten years, craftsmanship 17 disks, and the city to grow together, especially focusing on Wuxiang New Area, the development and construction of Datang Shengshi, Datang Shijia, Longgang Datang Fruit, Datang Headquarters No. 1, Datang International Center, is a strong urban industry chain developer.
Solutions:
1. Efficient coordination of three-stage logistics and transportation
The on-site construction equipment of each transformation project is poor, the transportation road is narrow, the vertical transportation of on-site handling is not smooth, and the traditional transportation mode is limited.After repeated demonstrations by the company's logistics platform, the Boyu General Warehouse was set up, and a professional logistics team was dispatched, and a three-stage transportation mode of "complete vehicle transportation to general warehouse - trolley diversion transportation to the project - professional handling team distribution and handling upstairs" was determined, and the seamless and efficient response of logistics and transportation was realized through efficient collaboration of intelligent logistics system.It has successively put into 42 vehicles, 50 cars diverted and transported, and 58 logistics and handling personnel.
2. Grid management of construction resources
Accurately design the construction process circulation chain, the construction resources are divided into pieces for grid management, the vertical process chain is seamlessly connected, the responsibility is to the person, the daily card daily, the daily disk is corrected, the multi-project construction is completed efficiently, and the multi-process cross-progress is carried out to ensure the construction progress of the project site.
3. Intelligent and efficient cross-regional dispatching of dispatching command center
Relying on the data decision-making system of Zonle Door Industry, accurately calculating the personnel and cross-regional dispatchable resources that should be invested in each link, the dispatching command center dispatched 186 people into the Longguang project operation in stages, and successively invested 04 business teams, 08 project management teams, 26 on-site self-installed construction teams and mobile auxiliary installation teams, and the number of single simultaneous construction personnel reached 102 people.
In this project, we supplied 400 sets of steels entrance front door of a finished size measurement, production, delivery, installation, and testing. The total amount of the project reached 280,000RMB.
Although this project Face with many difficulties, Such as Xixiangtang District is a traditional old city and the main shanty town in Nanning. In recent years, on the one hand, Xixiangtang District has intensified efforts to transform shanty towns, and on the other hand, it has carried out the development and construction of new houses on this basis. From shed renovation to building new houses, the cycle is relatively long, which is also an important factor for many developers to avoid Xixiangtang.