The fire door is a good catch in the market. Since launched, the product has won incessant praises for its appearance and high performance. We have employed professional designers who are style-conscious always keeping updating the design process. It turns out their efforts finally got paid. In addition, using the first-rate materials and adopting the latest advanced technology, the product wins its fame for its durability and high quality.
We established brand - Zonle, wanting to help make our customers' dreams come true and do everything we can to contribute to society. This is our unchanging identity, and it is who we are. This shapes the actions of all Zonle employees and ensures outstanding teamwork across all regions and business fields.
At zvnxibdm, all products, including fire door can be designed to your specifications. We also provide cost-effective, high quality, dependable and on-time delivery service.
What is a fire door and why is it important?
Basic information of project:
Time: 2019-2020
Location: China
Type: Plaza,Office Building and High-rise residential building.
Project name:Fire door project case of Nanning Baoneng-World Financial Center T1T3
Project Address: Wuxiang Road,Wuxiangxin District, Nanning City, Guangxi, China
Project introduction:
The item located on an important traffic road, with an area of 20000 ㎡, is an important item that is prioritized and valued by the government. Construction items include shopping supermarkets, real estate buildings, schools, hospitals, amusement parks, parks and high-class apartment buildings. The category promises to bring a modern comfortable life to people. In addition, the item with a large investment capital from China's major real estate corporations, with strict requirements and quality control, promises to be a new breakthrough item in the real estate industry.
Project Challenge and solution:
In this project, we supplied 186 fire door and finished size measurement, production, delivery, installation and testing.
Although this project consists of many difficulties, such as scattered project distribution, poor on-site construction equipment, narrow transportation roads, and multiple projects constructed at the same time, centralized delivery, large quantities and urgent construction period.
Solution:
1. Urgently dispatch the project management resources, complete the on-site product quantity, specification and configuration statistics, and specify the node schedule. Only the production line resources can be analyzed through zonle operation management system to automatically complete the accurate production scheduling.
2. Give full play to the manufacturing and design characteristics of zunle Zhineng, strive to produce and ensure 100% self built and qualified warehousing.
3. Realize seamless production line through intelligent logistics system and deliver goods overnight.
4.Through the data decision-making system, dispatch four installation teams to carry out simultaneous linkage construction, cross and go through multiple processes, and complete the installation and construction of departmental products as far as possible.
With a high sense of responsibility, Zonle has successfully completed the work item and received high appreciation from the contractor.
Basic information of the project:
Project name:Fire door project case of Nanning Datang Tiancheng Project Phase Ⅲ
Time: 2020
Location: China
Floor space:78666㎡
Type: Ordinary house, office building
House type:70㎡,96㎡,100㎡,106㎡,128㎡
Project Address: No.4 Beihu North Road, Xixiangtang District, Nanning, Guangxi, China
Project introduction:
Datang Tiancheng is the capital complex created by Datang Real Estate to enter the north center of the city, consisting of large commercial (large shopping center/multi-country theme street), high-end pure commercial office buildings and high-end residential buildings.
The project is located at the intersection of Beihu Road and Mingxiu East Road, with two traffic arteries of Beihu Road and Mingxiu Road, connecting Xingning District in the east and university assembly area in the west. Abundant facilities make all business needs need not travel far, metro Line 5 directly to the negative 1st floor of the project!
The surrounding facilities are perfect, schools, hospitals, banks, markets, parks and so on. There are Nancheng department stores, Renrenle supermarket, Nanning Hospital of Traditional Chinese Medicine, Guangxi Ethnic Hospital, Guangxi University of Traditional Chinese Medicine, Beihu Road primary school, people's Park and so on. It will be a new commercial highland in the north of the city and a resort for family life, leisure culture and food entertainment in the north of the city.
Datang Tiancheng can enjoy the powerful supporting facilities such as large commercial center, multinational commercial street and noble housing, providing business elites with an integrated all-round life of business, entertainment, leisure, shopping and living.
Project Challenge and solution:
In this project, we supplied 525 fire doors of a finished size measurement, production, delivery, fire door installation, and testing. The total amount reached RMB 945,500
The fire door installation project has many difficulties, such as short project period, night construction has great impact,Product quality problem found on site,and there is a deviation in the production of the door frame
solution:
1.Install and correct according to installation specifications
2.Each door frame in the debugging process, found that does not meet the performance requirements of the rectification in time
3.After installation, each door or frame must be tested, and inspected by the quality inspector, qualified rear can apply for inspection procedures
Basic information of the project:
Project name: Grade A fire door project case of China railway building Anji Shanyu City
Time: 2020
Location: China
Floor space:56309.59㎡
Type: Ordinary house,Foreign house
House type:99~178㎡
Project Address: No.66 Fazhan Avenue , Xixiangtang District, Nanning, Guangxi, China
Project introduction:
China railway building Anji Shanyu City is located in development avenue 66 (Wall Street valley next to), covers an area of about 85 acres, building area of about 170,000 square meters, is China railway building real estate craftsmanship to create the west city style quality community, is also the West city luxury elegant mansion. China railway construction real estate as a "house" and "customs property carve", adhering to the amorous feelings, continuation of the "mountain city" brand gene, using the modern Chinese architectural style, the western modern and Chinese feelings, "feelings in west rhyme" interpretation of the architectural aesthetics, let owner experience of the western building already contracted and the atmosphere, taste the east building of delicate and elegant. In addition, the project creates the most beautiful skyline through the collocation of rich product lines of low-rise, western-style house, western-style house and high-rise building, and reflects the residential scale of 3.0 villas density, providing the owners with broad, abundant and smart landscape vision and living space, and achieving the new fashion of quality living in the West City.
3.0 density: 3.0 density Style mansion.
Two lanes and Eight Hospitals: With eight scenes of Yongzhou as the design inspiration, eight scenes are extracted and placed into eight groups to create a unique garden space for private courtyards.
Double Subway: Chuangye Road station of Line 3 is about 400 meters away from the project. Anji passenger station of Line 2 is about 1km east of the project as the crow flies.
New Anji: Adjacent to Anji Wanda Plaza, shopping, leisure and entertainment is convenient.
Double Park: View the clouds of the 4000mu Mingyue Lake and the flowers of the 700mu Flower garden.
Door installation item:
In this project, we supplied 700 doors of a finished size measurement, production, delivery, grade A fire doors installation, and testing. The total amount reached RMB 1,120,000.
The grade A fire doors installation project has many difficulties, such as door lock panel installation uneven, door frame is tilted, some of the door closers won't retract. And there is noise in hinge shaft rotation. But after many adjustments and supervision, the grade A fire doors installation was finally completed on time.
Basic information of the project:
Project name: fire door project case of Nanning Ronghe Park Avenue
Time: 2020
Location: China
Floor space:33381㎡
Type: Ordinary house
House type:105~125㎡
Project Address: No.26 Fenglin Road, Qingxiu District, Nanning, Guangxi, China
Project introduction:
Ronghe Group has been deeply involved in Fengling North, and has developed a number of projects in Fengling North. Ronghe Park Avenue is the ninth major project developed by Ronghe Group in Fengling North, located at No. 26 Fenglin Road, Qingxiu District.
Ronghe Park Avenue covers a total area of 50.072 mu, with a total construction area of 101,296.75 square meters. There are 5 residential buildings planned in the project, all of which are single-family and single-family units. The widest building spacing is 90 meters. Enjoy a luxurious low-density and comfortable life, sit on a 15,000-square-meter neoclassical garden, and enjoy a 2.2-story low-density park.
Commercial facilities: Ronghe Park Avenue is planned to have more than 8,000 square meters of commercial space. In the future, we will build a first-class commercial service business district. From the commercial and business centers of Huafu Avenue, such as China Resources Mixc City, Exhibition Hangyang City, Shengtiandi, Qingxiu Wanda and other commercial centers. Here you can enjoy the most abundant living facilities in Nanning.
Transportation advantages: The location of the project is the most important five-vertical and five-horizontal traffic road network in Nanning (five verticals: Xiangzhu Avenue, Cuizhu Road, Fenghuangling Road, Fenglin Road, Ring Expressway; five horizontals: Minzu Avenue, Yunjing Road, Foziling Road, Fengling North Road, Changhong Road) can quickly connect us to various urban areas in Nanning.
Subway: From the East Station of Metro Line 1, it will only pass through the East Railway Station and cross Fengling North.
Medical resources: The project is adjacent to the East Hospital of the Second Affiliated Hospital of Guangxi Medical University. It has advanced diagnosis and treatment equipment and superb medical skills. It is a modern third-class general hospital. There is also the Guangxi Autonomous Region Maternal and Child Health Hospital, which is only 3 kilometers away from the project. It is also a third-level A-level maternal and child health care hospital and a baby-friendly hospital integrating health care, medical treatment, scientific research, teaching, and grass-roots maternal and child health care guidance.
School facilities: Ronghe Boya Avenue Kindergarten, Tiantao Experimental Primary School (Yinshan Campus), Yunjing Road Primary School, Tiantao Experimental Middle School (Yinshan Campus), Nanning No. 2 Middle School (Fengling Campus)
Door installation item:
In this project, we supplied 862 fire doors of a finished size measurement, production, delivery, doors installation, and testing.
The fire doors installation project has many difficulties, such as installation period is short,installation error in door opening direction, and the size of the door opening is not enough reserved . But after many adjustments and supervision, the fire doors installation was finally completed on time.
1. Raw material problem: The actual raw materials used do not match the materials used in design or testing. Such as thin steel plate instead of thick steel plate, cold rolling instead of galvanized, no fire-proof insulation material filled, or honeycomb cardboard instead of aluminum silicate fiber cotton, even if the filling is not full, it is shoddy to reduce its production cost. The focus of the inspection is deviated. Filling material: A simple and practical method is to tap and listen to the sound. If the sound is dull, it means that there is filling in the door frame and door leaf. (Hinge hole, lock hole, latch hole, door closer sequencer fixing hole, upper and lower ventilation holes, process holes, etc.), at present, the filler for Class A and B fire doors on the market is white aluminum silicate Fiber cotton (different bulk density, grade A is above 200kg/m3, grade B is above 160kg/m3), grade C uses yellow rock wool.
2. The thickness of the door leaf: check whether the actual thickness of the door leaf conforms to the thickness of the door leaf in the test report.
3. Fireproof glass problem: It is often found on the construction site that insulating glass, thin fireproof glass with insufficient grade, or fireproof glass with poor lighting and excessive number of bubbles is used to pretend to be fireproof glass with high fire resistance. When inspecting, you can pick out a piece of glass at will, remove the seal on the upper corner of the glass to check whether there is a seal filled with fireproof liquid, and measure its thickness, which should be compared with the data on the fireproof glass test report.
Contact Person : Catherine Wong
E-Mail : catherine@zonledoors.com
Whatsapp/Skype:18587696286
Cel : 0086-18587696286
Wechat : xx377727587
QQ : 377727587
Website : https://zonledoors.com
Add : 10th Floor,No30, Xiangzhu Road , Qingxiu District, Nanning City, Guangxi, China