Basic information of the project:

Project name:Fire door project case of Nanning Datang Tiancheng Project Phase Ⅲ

Time: 2020

Location: China

Floor space78666

Type: Ordinary house, office building

House type7096,100,106,128

Project Address: No.4 Beihu North Road, Xixiangtang District, Nanning, Guangxi, China

Project introduction:

Datang Tiancheng is the capital complex created by Datang Real Estate to enter the north center of the city, consisting of large commercial (large shopping center/multi-country theme street), high-end pure commercial office buildings and high-end residential buildings.

The project is located at the intersection of Beihu Road and Mingxiu East Road, with two traffic arteries of Beihu Road and Mingxiu Road, connecting Xingning District in the east and university assembly area in the west. Abundant facilities make all business needs need not travel far, metro Line 5 directly to the negative 1st floor of the project!

Fire door project case of Nanning Datang Tiancheng Project Phase Ⅲ 1

The surrounding facilities are perfect, schools, hospitals, banks, markets, parks and so on. There are Nancheng department stores, Renrenle supermarket, Nanning Hospital of Traditional Chinese Medicine, Guangxi Ethnic Hospital, Guangxi University of Traditional Chinese Medicine, Beihu Road primary school, people's Park and so on. It will be a new commercial highland in the north of the city and a resort for family life, leisure culture and food entertainment in the north of the city.

Fire door project case of Nanning Datang Tiancheng Project Phase Ⅲ 2

Datang Tiancheng can enjoy the powerful supporting facilities such as large commercial center, multinational commercial street and noble housing, providing business elites with an integrated all-round life of business, entertainment, leisure, shopping and living.

Fire door project case of Nanning Datang Tiancheng Project Phase Ⅲ 3Fire door project case of Nanning Datang Tiancheng Project Phase Ⅲ 4

Project Challenge and solution:

In this project, we supplied 525 fire doors of a finished size measurement, production, delivery, fire door installation, and testing. The total amount reached RMB 945,500

The fire door installation project has many difficulties, such as short project period, night construction has great impactProduct quality problem found on siteand there is a deviation in the production of the door frame

Fire door project case of Nanning Datang Tiancheng Project Phase Ⅲ 5

 

solution:

1.Install and correct according to installation specifications

2.Each door frame in the debugging process, found that does not meet the performance requirements of the rectification in time

3.After installation, each door or frame must be tested, and inspected by the quality inspector, qualified rear can apply for inspection procedures

Fire door project case of Nanning Datang Tiancheng Project Phase Ⅲ 6

prev
Wooden door project case of Nanning Poly Lingxiu Qiancheng Project Phase Ⅵ
Steel door project case of Nanning Huarun-Wanxiang Hua Mansion Project Phase I
next
recommended for you
no data
GET IN TOUCH WITH US
     PLEASE CALL US     
+86-18587696286
Copyright © 2024 Guangxi Zonle Doors Manufacture Co., Ltd| Sitemap
Contact us
whatsapp
contact customer service
Contact us
whatsapp
cancel
Customer service
detect