Basic information of project:
Time: 2018
Location: Thailand
Project Address: 2089 Sukhumvit Rd Phra Khanong Nuae, Watthana, Bangkok 10260 Thailand
Type: Complex Shopping Centre / Hotel / Shopping Mall project
Project name: CE Certificate Steel Fireproof Fire Rated Emergency Escape Door and Aluminium Glass Sliding Frameless Window project case of Century The Movie Plaza in Thailand
Project introduction: Century The Movie Plaza, the operator of the long-standing multi-purpose complex comprising of a shopping centre, movie theatre, and hotel. It spans over 70,000 square metres and aims to introduce a new shopping experience. Century The Movie Plaza serviced an average of 15,000 visitors daily.
Project Challenge and solution:
In this project, our zonle doors manufacture company supplied 354 CE Certificate Steel Fireproof Fire Rated Emergency Escape Door and 1689 Aluminium Glass Sliding Frameless Window of a finished size measurement, production, delivery, interior wooden door installation, and testing.
The CE Certificate Steel Fireproof Fire Rated Emergency Escape Door and Aluminium Glass Sliding Frameless Window installation project has many difficulties, such as short project period, quality problem with the construction materials and so on. But after many adjustments and supervision, the CE Certificate Steel Fireproof Fire Rated Emergency Escape Door and Aluminium Glass Sliding Frameless Window installation was finally completed on time.
Product characteristics and quality:
Installation steps of CE Certificate Steel Fireproof Fire Rated Emergency Escape Door:
(1)Measure the size of the door opening and confirm the size of the fire door required.
(2)Check the installation position of the door frame to ensure that it is vertical and horizontal. If necessary, use a spirit level to check.
(3)Install the door frame and fix it with screws or expansion bolts. Pay attention to the strength of the installation and ensure that the door frame is firm and stable.
(4)Install the door leaf into the door frame and adjust the gap between the door leaf and the frame to ensure that it is consistent and there are no large gaps.
(5)Install the hinges on the door frame and door leaf, and fix them with screws. Ensure that the hinges are installed horizontally and vertically, and that the door can be opened and closed smoothly.
(6)Install the lock and handle on the door leaf, and fix them with screws. Ensure that the lock and handle are installed in the correct position and that the door can be locked and unlocked smoothly.
(7)Install the door closer on the door frame and door leaf, and adjust the tightness and speed of the door closing to ensure that the door can be closed quickly and tightly.
(8)Install the door seal on the door frame and door leaf, and ensure that it is tightly sealed to prevent smoke and harmful gases from entering the room.
(9)Install the fireproof glass or fireproof window on the door leaf if necessary, and ensure that it meets the requirements of fire resistance and safety.
(10)Test the fire door after installation to ensure that it can be opened and closed smoothly, and that it meets the requirements of fire resistance and safety.
Installation steps of Aluminium Glass Sliding Frameless Window:
Step 1: Pack Window Sill Until Level
First of all you need to prepare the window opening. It’s important to get the sill straight and level. Start at one end with a 5mm packer and work along the length of the sill until it’s level.
Step 2: Spread Packers Along Window Sill and Fix Down
Finish off levelling the sill by adding more packers along the length of the sill to help support the window and fix into place.
Step 3: Use Packers to Level One Side of Window Frame
Plumb one side of the window opening using the level and fix packers into place.
Step 4 : Unroll Flashing and Position on Outside to Prevent Leaks
Put your window upside down to unroll the black flashing that will sit on the outside of the house and keep any water out.
Step 5: Install Window Hard Up Against Packed Opening
Install the window so it sits against your levelled sill and hard up against the reveal you’ve plumbed up.
Step 6: Set Window Reveal for 10mm Gyprock
We have set up the inside of our window reveal for 10mm gyprock. To do this, use a 10mm packer and place it under the frame to make sure it’s flush with your timber reveal. Once you’re sure, you’re ready to fix the window through where you’ve packed it.
Step 7: Use Packers to Fill Opposite Side and Fix Through
Once you get to the opposite side of your window use your packers again to pack between the reveal and the stud, making sure it’s nice and firm. Fix off through these packers.
Step 8: Place Packer Under Centre Mullion
Once your window is fully fixed off, place a packer directly underneath the centre mullion for support.
Step 9: Install Head Flashing
Now that your window is fully installed, it’s essential for the compliant waterproofing of windows and doors in this type of installation to have a hardened head flashing fitted, then you’re ready for some cladding!
Then the picture after installation is as follows: