loading

Zonle Doors has specialized in door manufacturing for 20years

Fire door project case of Nanning Huarun-zhongshan Mansion Project Phase I

Basic information of the project:

Project name: Fire door project case of Nanning Huarun-zhongshanfu Project Phase I

Time: 2019

Location: China

Type: Ordinary house, apartment, garden house, house, self - living commodity house 

Project Address: 229 Zhongshan Road,Qingxiu District, Nanning, Guangxi, China

Project introduction:

Located in the north Bank of Yongjiang River, The Zhongshan Mansion Project of China Resources Land co., Ltd. consists of two plots, Zhongshan Road and Linjiang Street, with a total land area of 81.6 mu and a net land area of 64.4 mu.  The project is 777 meters away from Xinmin Road station of Line 1, with convenient transportation, complete supporting facilities and chaoyang Business district.  

Zhongshan Mansion of China Resources Land is positioned as a high-quality improved residential building with beautiful scenery of 1000 meters riverside. It has the prosperous Chaoyang business district of the old city, supporting commercial facilities of Wanxiang Hui, rich educational resources, surrounded by two subways and a unique view of the riverside, with obvious geographical advantages.  To provide driving force for "new old city" and create a new commercial landmark of  Nanning.     

The project has four apartment types of 90 square meters, 117 square meters, 120 square meters and 153 square meters. The apartment type is square, and the size of the opening depth is comfortable. Most of the apartment types realize lighting on three sides, and the balcony with 270° viewing Angle is set in some apartment types.

Fire door project case of Nanning Huarun-zhongshan Mansion Project Phase I 1

Fire door project case of Nanning Huarun-zhongshan Mansion Project Phase I 2

 

Project Challenge and solution:

In this project, we supplied 1462 fire doors of a finished size measurement, production, delivery, installation, and testing. The total amount reached RMB 1,520,500

Although the project has many difficulties, such as short project period, close to the city center, large flow of people, narrow traffic road, too small space between buildings, big security risks, the project is urgent.  

Solution:

1.Safety management department organize safety management education and check safety risks every day

2.Zonle organized a safety protection conference to publicize the importance of assembling fire doors;

 

 

Fire door project case of Nanning Huarun-zhongshan Mansion Project Phase I 3

Fire door project case of Nanning Huarun-zhongshan Mansion Project Phase I 4

 

 

prev
Steel door project case of Nanning Sunac- Jiuxi Mansion Project Phase II
Fire door project case of Nanning Longguang-Jiulongwan Project
next
recommended for you
no data
GET IN TOUCH WITH US
     PLEASE CALL US     
+86-18587696286
Copyright © 2024 Guangxi Zonle Doors Manufacture Co., Ltd| Sitemap
Contact us
whatsapp
contact customer service
Contact us
whatsapp
cancel
Customer service
detect